Home ProductsConstruction Site Lift

VFC Control Passenger And Material Construction Site Lift Adjustable Speed 2 Ton Load

Good quality Construction Elevator for sales
Good quality Construction Elevator for sales
Wuhan Changlong has rich experience in the maintenance of the construction hoist. The performance of their hoist is good.

—— Mr. Dung from Vietnam

This company is factory and also do rental business, they are expert in this field, can give us advice. We are now their exclusive dealer.

—— Mr. Politi from Egypt

I'm Online Chat Now

VFC Control Passenger And Material Construction Site Lift Adjustable Speed 2 Ton Load

China VFC Control Passenger And Material Construction Site Lift Adjustable Speed 2 Ton Load supplier

Large Image :  VFC Control Passenger And Material Construction Site Lift Adjustable Speed 2 Ton Load

Product Details:

Place of Origin: China
Brand Name: Changlong Century
Model Number: SC200/200

Payment & Shipping Terms:

Minimum Order Quantity: 1 set
Packaging Details: Plastic covering, 40 feet HQ container
Delivery Time: 7-10 days after down pament
Payment Terms: T/T, L/C
Supply Ability: 30 set per month
Detailed Product Description
Capacity: 2000kg Speed: 0-63 M/min
Cage Dimension: 3.2m Length*1.5m Width*2.25m Height Max Installation Height: 350m
Type: Rack And Pinion Type Driving Part: 3*15 Kw Motors
Electric Box: Inverter Variable Frequency, Variable Speed Safety: Saj40-1.4 Safety Device

 

2000kg double cabin 0-63m/min speed passenger and material construction lift

 

Description 

 

  • Changlong century focus on the the manufacturing of construction lift. We can provide reliable and durable lift, competitive prices and good after services.

 

  • Available capacity for personnel and materials construction lift range from 1000kg to 2700kg. Single cage and double cages are both available.

 

  • VFC controls system is applied in electrical control system. Variable frequecy bring a variable speed. The VFC control also can protect the elecrical component being damaged by the current.

 

 

Technical Data

 

Item

Construction lift

Load capacity

2 Ton

Max Installation height

350m

Lifting speed

0-63m/min

Cage size

3.2*1.5*2.5m

Motor power

3*15kw

Speed ratio

1:10

Invertor Power

45 kw

Safety device

SAJ40-1.4

Mast section size

0.65*0.65*1.508m

Power Supply

380V, 50Hz or customized

 

 

Performance features:

 

  • ​Self erecting tool for mast section- can be installed without the tower crane

 

  • Multi function operation platform, with wireless calling indicator, joysticks, overload protector, more function can be added if needed.

 

  • The lading door can lading to the floor, is safer and more convenient.  Call buttons can be fixed to each floor, convenient for calling.

 

 

Application 

 

  • Changlong Century is a professional manufacturer for construction lift. Our construciton lift give reliable vertical transportation for materials and passenger. Our lift can be apllied in building construction, brige construction, chimminy, etc.

 

 

Safety features:

 

  • Upper limit and lower limit switches, protecting the hoist from crashing bottom or rushing out or the top.

 

  • Safety device. Speed sensitive parachute braking system. Magnetic brake motor

 

  • Door interlock. Will shut down the power if the doors are not closed properly.

 

  • Overload protector- Will alarm when the hoist is overloaded

 

  • Emergency stop button

Contact Details
Wuhan changlong century machinery co.,ltd

Contact Person: issac

Send your inquiry directly to us (0 / 3000)